Mobile Home Checklist

Complete the checklist below to help us provide you the most prompt service.

  • $5.00 Membership Fee
  • $35.00 Connect Fee
  • Deposit: Based on credit history verification
  • E911 Address Assignment form @ 2525 B 14th St.
  • Lauderdale County application and development permit obtained @ 2525 B 14th St.
  • Mobile Home Registration #
  • Social Security Number
  • Nearest Neighbor
  • Do you want an outdoor light?
  • Is your stove electric or gas?
  • Is your water heater electric or gas?
  • What is the capacity of your central unit (in tons)?
  • What is the capacity of your heat pump (in tons)?
  • Is your central heat electric or gas?
  • If electric, what is the KW rating?
  • What water association are you served by?
  • Do you use a window unit air conditioner?
  • If so, what is the capacity in BTUs?
  • Have you signed the Right-of-Way easement?
  • If buying a pre-wired pole/breaker from EMEPA, please put a stake with ribbon in the ground where you want the pole. Stake provided by EMEPA.

Please contact EMEPA when the mobile home is set; power panel and/or meter pole is up.

Complete this questionnaire and return to EMEPA. Allow 5-10 working days for power connection to your home. If a “Highway Crossing from MDOT” is required, allow an additional 14 days.